<?xml version="1.0" encoding='utf-8' ?>
<nspnews type="text">
<version>v8.0</version>
<date>2026-11-05 19:13:03</date>
<action>I</action>
<registdate>2026-11-05 18:56:44</registdate>
<modifydate>2026-11-05 19:12:41</modifydate>
<publishdate>2026-11-05 19:13:00</publishdate>
<embargo>N</embargo>
<newsid>834924</newsid>
<orgid>834826</orgid>
<language>EN</language>
<category1>20</category1>
<category2>2001</category2>
<category1_name>기업</category1_name>
<category2_name>중기/벤처/기타</category2_name>
<statusID>1</statusID>
<saleID>N</saleID>
<formatID>1</formatID>
<typeID>3</typeID>
<newsSubject><![CDATA[LH. Using Ultra-High-Strength PHC Piles … Reducing Foundation Work Volume by 15-18%]]></newsSubject>
<newsSummary><![CDATA[]]></newsSummary>
<newsTag><![CDATA[LH,PHC]]></newsTag>
<newsLinks><![CDATA[]]></newsLinks>
<news_prolog><![CDATA[(Seoul=NSP NEWS) =]]></news_prolog>
<news1><![CDATA[The Korea Land and Housing Corporation(LH) is using ultra-high-strength PHC piles—which offer greater load-bearing capacity than standard products—in the foundation work for public housing projects, thereby reducing the number of piles required and the total construction length by 15-18 percent.

It plans to first apply it to Uijeongbu Legal Town and Ansan Singil District 2, and begin construction in December, and expand the scope of application after verifying the actual construction results.

PHC(Pre-tensioned spun High-Strength Concrete) piles are foundation structures that transfer the load of a building to the ground. Ultra-high-strength versions feature greater concrete strength than standard PHC piles, allowing each pile to support a larger load.

One of the reasons behind LH’s move to introduce ultra-high-strength products is the narrowing price gap.

The new standards will first be applied to the Uijeongbu Legal Town and Ansan Singil District 2 projects. Both sites have completed the design phase, and construction is scheduled to begin this December.

A comparison of the design results with those obtained using standard PHC piles showed that both the number of piles required and the total length were reduced by 15-18 percent. LH anticipates that this reduction in construction volume will shorten the foundation work period and improve cost-effectiveness.]]></news1>
<news2_title><![CDATA[]]></news2_title>
<news2><![CDATA[]]></news2>
<news3><![CDATA[]]></news3>
<news4_title><![CDATA[]]></news4_title>
<news4><![CDATA[]]></news4>
<news5_title><![CDATA[]]></news5_title>
<news5><![CDATA[]]></news5>
<news_epilog_info><![CDATA[]]></news_epilog_info>
<news_epilog_byline><![CDATA[By Soon-ki Lee(s8789@nspna.com) and Hee-jin Kim(ang0919@nspna.com)]]></news_epilog_byline>
<news_epilog><![CDATA[ⓒNSP News Agency·NSP TV. All rights reserved.]]></news_epilog>
<imageL><![CDATA[https://file.nspna.com/news/2026/11/05/20261105185938_834924_0.jpg]]></imageL>
<imageP><![CDATA[https://file.nspna.com/news/2026/11/05/photo_20261105185938_834924_0.jpg]]></imageP>
<image1><![CDATA[https://file.nspna.com/news/2026/11/05/20261105185938_834924_1.jpg]]></image1>
<image2><![CDATA[]]></image2>
<image3><![CDATA[]]></image3>
<image4><![CDATA[]]></image4>
<image5><![CDATA[]]></image5>
<image1_place><![CDATA[c]]></image1_place>
<image2_place><![CDATA[c]]></image2_place>
<image3_place><![CDATA[c]]></image3_place>
<image4_place><![CDATA[c]]></image4_place>
<image5_place><![CDATA[c]]></image5_place>
<image1_text><![CDATA[]]></image1_text>
<image2_text><![CDATA[]]></image2_text>
<image3_text><![CDATA[]]></image3_text>
<image4_text><![CDATA[]]></image4_text>
<image5_text><![CDATA[]]></image5_text>
<image1_source><![CDATA[]]></image1_source>
<image2_source><![CDATA[]]></image2_source>
<image3_source><![CDATA[]]></image3_source>
<image4_source><![CDATA[]]></image4_source>
<image5_source><![CDATA[]]></image5_source>
<vodSite><![CDATA[]]></vodSite>
<vodID><![CDATA[]]></vodID>
<vodTitle><![CDATA[]]></vodTitle>
<vodWidth><![CDATA[]]></vodWidth>
<vodHeight><![CDATA[]]></vodHeight>
<advertorial><![CDATA[]]></advertorial>
<location><![CDATA[Seoul]]></location>
<teamID>110</teamID>
<teamName><![CDATA[국제부]]></teamName>
<writerID>s8789</writerID>
<writerName><![CDATA[Soon-ki Lee]]></writerName>
<writerTitle><![CDATA[Reporter]]></writerTitle>
<writerEmail><![CDATA[s8789@nspna.com]]></writerEmail>
<writerID2>ang0919</writerID2>
<writerName2><![CDATA[Hee-jin Kim]]></writerName2>
<writerTitle2><![CDATA[Reporter]]></writerTitle2>
<writerEmail2><![CDATA[ang0919@nspna.com]]></writerEmail2>
<writerID3></writerID3>
<writerName3><![CDATA[]]></writerName3>
<writerTitle3><![CDATA[]]></writerTitle3>
<writerEmail3><![CDATA[]]></writerEmail3>
</nspnews>
